Skip to main content

Bridges Case Studies

Lichfield Southern Bridge

Construction was awarded the works by Amey to carry out resin Injection as a construction solution to the in-situ Bridge bearings, whilst also carrying out numerous finishing works that was required for the bridge to be handed over to the client.

Read more

M5 Viaduct Oldbury

CLM Construction was commissioned by Kier Highways to provide and coordinate the Installation of structural monitoring systems for ongoing structural checks during the main viaduct Vortex drainage installation works.

Read more

M6 R193

CLM Construction was commissioned by Kier Highways to complete Repair Contract R193, a concrete repairs and ICCP scheme at M6 Junction 6 Gravelly, for crucial elements of the supporting structure for the M6 mainline and various links around the spaghetti junction motorway section.

Read more

M42 NEC East Access Bridge

When the street lights went out on the East Way Bridge serving the NEC it was discovered that the bridge had slipped approximately 200mm off line at the east abutment expansion joint which had severed the cables within the footway...

Read more